Good Shepherd Lutheran
New Building Concept Drawings
[ Lower Level ] [ Main Level ] [ Upper Level ] [ Sanctuary ] [ Administrative Area ]

Pre-engineered sanctuary, Plank floor system
Construction time is reduced
Canopy delayed
Existing sanctuary not modified, doors added
Last Updated: 09/27/06 08:57 AM